Tejjy - Utilizing BIM LOD in Construction Project

Have you come across the phrase LOD before? In addition, what does LOD stand for? Why is it being done? We'll stop brainstorming now. We are talking about the main LOD component today, along with variations at each of its levels. Every outsourced building project is incomplete without the use of BIM LOD. The team takes on various LOD depending on the demands and requirements of the project. These fall under the LOD categories of 100, 200, 300, 350, 400, and 500. 

 

3p.jpg

 

Introduction: 

 

The mechanism by which the necessary data that BIM models hold is indicated is called LOD, or Level of Details or Level of Development. We can sum up the entire notion of the work and its methodology in one word: it is the condition of information. Further, a comprehension of the level of data, its characteristics, and geometrical data is all the information that a BIM model needs to function. An evident type of level of detail services is utilized to ensure the success of this job. However, as is often the case, the characteristics cannot be seen through a virtual model; rather, a thorough understanding of the level of detail or level of development services is required. 

 

Different BIM LODs: 

 

  • Conceptual Design LOD 100: LOD 100 is the first task taken on in the project's beginning. This level aids in providing the physical information necessary for a project to be successful.  
  • Schematic Design, LOD 200: We may state that this is the project's longest phase, during which every model must go through attempts to produce both classic and modern architectural designs. 
  • Detailed Design LOD 300: It is the method used to graphically depict the element in the model. 
  • Greater Specifications LOD 350: It provides the interaction between various building systems and design. More sections that include both written and graphical data are provided after that. 
  • Fabrication & Assembly LOD 400: The project phases are scheduled and coordinated using the LOD 400 procedure. In this situation, the common stage of development is established using the design data. The fabrication model is built and produced using several CAD platforms.  
  • As-Built LOD 500: When the project is finished, it is turned over to the facility managers who are keeping track of the building's life-cycle management. Further, it is claimed that the use of LOD is more exact and precise.   

Higher BIM LOD equates to more detail: The notion that a project acquires a more detailed output, the higher the BIM LOD is thought to be true in the building sector. But this claim is not entirely accurate. Between LOD 350, LOD 400, and LOD 500, it is most frequently observed. The entire purpose of having a higher BIM LOD is to establish a level of trust between the particular data that the facility manager and the owner require from the BIM outsourcing firms and those specific data.  

 

Final thought: 

 

Want to know the steps and procedures that improve the usability and scalability of the complete BIM LOD stages? The various phases of LOD are taken into consideration based on the project's concept and actual needs. The best strategy to accomplish the goal at a higher level is to specify the required BIM LOD with significant advantages. To get more information, join up with Tejjy-BIM Inc at 202-465-4830 or info@tejjy.com.